Roads&Highways Sec – Infrastructure https://lntiel.com Infrastructure Wed, 03 Jan 2024 16:59:58 +0000 en-US hourly 1 https://wordpress.org/?v=5.1.18 https://lntiel.com/wp-content/uploads/2024/01/cropped-White-32x32.jpg Roads&Highways Sec – Infrastructure https://lntiel.com 32 32 Detailed Project Report for 8-laning Tambaram to Tindivanam / Madhavaram to ORR junction / Maduravoyal to Sriperumbadur https://lntiel.com/index.php/detailed-project-report-for-8-laning-tambaram-to-tindivanam-madhavaram-to-orr-junction-maduravoyal-to-sriperumbadur/ Tue, 07 Aug 2018 07:05:47 +0000 http://lntiel.com/?p=4051 Project Name: Feasibility Study and Preparation of Detailed Project Report for Augmentation of (i) Tambaram (km.28/000) – Tindivanam (km. 121/000) section of NH-45 in the State of Tamil Nadu under NHDP phase-V (ii) From Km.11.000 to Km21.400 (Madhavaram junction to ORR junction) of Chennai-Tada section of NH-5(iii) From km.13.800 (Maduravoyal Junction) to Km.35.800 (near Sriperumbadur Toll plaza) of Walajahpet-Poonamalle Section of NH-4.

Client: National Highway Authority of India

Project Year: 2018

Project Description:

(i) Tambaram to Tindivanam section of NH-45 will be upgraded from km28.000 to km 50.000 with six lane Elevated corridor and at grade 4-lane with Service roads, duly integrating with existing and/ or proposed Elevated structures for arriving Technically feasible and economical proposal.  From km 50.000 to km 121.000 the proposal is for at-grade to 8 lanes, with 6 lane Elevated corridor/Flyovers in Built-up sections as per judicious requirement based on traffic requirement for NH-45. Project corridor passes through mainly plain terrain. Major bridges are proposed across the Water bodies such as Palar, Kiliyar and Madhuranthagam Lake. Project road has various structures such as ROBs, Grade separators, Flyovers, VUPs and PUPs. Staggered toll plaza sections are proposed without disturbing existing toll plazas. The at grade road under Elevated corridor is proposed to be constructed with rigid pavement and other sections are with flexible pavement.

(ii) The Second Project stretch from km.11.000 to Km21.400 (Madhavaram junction to ORR junction) of Chennai-Tada section of NH-5 passes through built-up area. Improvement proposal include upgradation with elevated corridor along the existing median with six lane at-grade road, which is also widened to entire existing ROW with rigid pavement. Entry/ Exit ramps are proposed to provide access from/to Elevated corridor at required locations.

(iii)Third project stretch from Km13.800 (Maduravoyal junction) to Km 35.800 (Near Sriperumbadur Toll plaza) of Walajahpet – Poonamalle Section of NH-4 is to be upgraded with six lane Elevated corridor and at grade 6-lane with Service roads, duly considering the projected Bangalore-Chennai Expressway traffic at merging point (at km 35.600 of Walajahpet-Poonamalle Section of NH-4). At existing flyover locations, second level crossing is proposed for elevated corridor. Entry/ Exit ramps are proposed to provide access from/to Elevated corridor at required locations. Toll plaza is provided to access the Bangalore-Chennai Expressway. The entire at grade road is proposed to be constructed with rigid pavement.

]]>
Detailed Project Report for Ahmedpur to Chumbhali Phata https://lntiel.com/index.php/detailed-project-report-for-ahmedpur-to-chumbhali-phata/ Tue, 07 Aug 2018 07:02:00 +0000 http://lntiel.com/?p=4049 Project Name: Preparation of Detailed Project Report for Ahmedpur – Kopra – Kingaon – Ambejogai – Kaij – Manjarsumbha – Patoda – Jamkhed  section (NH 548D)  in the State of Maharashtra for up-gradation to Two Lanes with paved shoulder /Four lane configurations

Client: Maharashtra State Road Development Corporation (MSRDC)

Project Year: 2016

Project Description:  The project road from Ahmedpur to Chumbhali Phata is proposed for widening to two lane with paved shoulder. The length of road is 170 Km out of which 21.6 Km is proposed for four lane divided carriageway. The entire road is proposed to be reconstructed with rigid pavement. Detailed Project Report include detailed highway design, design of pavement and overlay with options for flexible or rigid pavements, design of 2 major bridge, 40 minor bridge, 1 Railway over Bridge and 2 Vehicular Underpasses, 148 Culverts, intersections and project facilities, quantities of various items, detailed working drawings, detailed cost estimates, economic and financial viability analyses, environmental and social feasibility, social and environmental action plans as appropriate and documents required for tendering the project on commercial basis for international / local competitive bidding.

]]>
Detailed Project Report for Puthupady to Muthanga https://lntiel.com/index.php/detailed-project-report-for-puthupady-to-muthanga/ Tue, 07 Aug 2018 06:59:58 +0000 http://lntiel.com/?p=4047 Project Name: Detailed Project Report for capacity augmentation to Two Lanes with paved shoulder configuration for NH 766 from Puthupady (Km 40/000) to Muthanga (Km 117/600) in the State of Kerala

Client: Public Works Department, National Highways, Thiruvananthapuram, Kerala

Project Year: 2017

Project Description:  The project road from Puthupady (Km 40/000) to Muthanga (Km 117/600) is proposed for widening to two lane with paved shoulder. The length of road is 77.60 Km out of which 11.9 Km passes through Ghat section and 7.8 Km passes through forest section. The entire road is proposed for overlay and widening with flexible pavement. Detailed Project Report include detailed highway design, design of pavement and overlay with flexible pavements, design of 20 minor bridge, 209 Culverts, intersections and project facilities, quantities of various items, detailed working drawings, detailed cost estimates, economic and financial viability analyses, environmental and social feasibility, social and environmental action plans as appropriate and documents required for tendering the project on commercial basis for international / local competitive bidding.

]]>
Detailed Design for Kishangarh- Gulabpura https://lntiel.com/index.php/detailed-design-for-kishangarh-gulabpura/ Tue, 07 Aug 2018 06:56:47 +0000 http://lntiel.com/?p=4045 Project Name: Six Laning of Kishangarh to Gulabpura section of NH-79A and NH79 in the State of Rajasthan (Length 90.000) on DBFOT (Toll) under NHDP Phase V, Package I

Client: IRB Infrastructure Developers Ltd.,Mumbai

Project Year: 2017

Description: The Scope of work involves Widening from existing 4 lane to 6 lane with paved shoulders for a length of 90.000 km from Kishangarh to Gulabpura section of NH-79A and NH79 in the State of Rajasthan on DBFOT. The project road section starts from Kishangarh (Km 0.830 to Km 36.100 of NH-79A and Km 15.000 to Km 69.730 of NH-79) and ends near Gulabpura at Km 69.730 of NH-79. The project road is traversing through the districts of Ajmer & Bhilwara in Rajasthan. The project stretch passes through the major settlements such as Kishangarh, Chotta Udaipur, Tikawada, Arai, Srinagar, LabedaBir, Nasirabad, Lohdi, Hiyaliya, Bandanwara, Galteeshmeel, Vijayanagar and Gulabpura. The project stretch is in plain terrain. The project includes 1 Toll plaza, 6 Truck lay byes, 14 busbays, 5 Flyovers, 17 pedestrian underpasses, 5 Vehicular underpasses, 24 minor bridges, 1 major bridges, 122 culverts, 12 major intersections, 126 Km of service roads and project facilities. The entire road is proposed to be constructed with flexible pavement.

]]>
Detailed Project Report for Alappuzha Town https://lntiel.com/index.php/detailed-project-report-for-alappuzha-town/ Tue, 07 Aug 2018 06:45:33 +0000 http://lntiel.com/?p=4043 Project Name: Preparation of DPR for the Improvement of 50 km of core area roads and 32 km Peripheral roads of Alappuzha Town.

Client: Kerala Road Fund Board, Thiruvananthapuram, Kerala

Project Year: 2016-2017

Project Description:  The objective of the study is to prepare a Detailed Project Report (DPR) for selected road corridors in the city of Alappuzha. Short and long term road improvement measures have been envisaged separately covering road network in the core town area and suburbs. The study for short term improvement proposal is to cover about twenty one (21) road corridors in the core town area, whereas the long term development proposal included Four (4) selected corridors located in the suburbs. The total length of roads included for the  short term development (Phase-I) is about 50 Km, whereas for total road length for long term (Phase-II) development was 32 Km. Detailed Project Report included detailed geometric design of roads, design of new pavement and overlay with flexible pavements, design of minor bridges, Culverts, development of intersections and other project facilities, preparation of detailed working drawings, detailed BoQ and cost estimates, economic and financial viability analyses, environmental and social feasibility and preparation of social and environmental action plans as appropriate. It also included preparation of A Report on preservation and protection of Heritage buildings in the Town.

]]>
Jammu Ring Road https://lntiel.com/index.php/jammu-ring-road/ Tue, 07 Aug 2018 06:40:25 +0000 http://lntiel.com/?p=4041 Project Name: Detailed Engineering Design for Construction of Stand alone Ring Road/ Bypass around Jammu City South West Side From Raya Morh,  Km.85+130 of NH44 (Design Ch.-0+687) To Km.123+203 of Nagrota Bypass of NH-44 (Design Ch.57+568) on Engineering, Procurement & Construction (EPC) Mode

Client: Gayatri Projects Limited

Project Year: 2018

Project Description: The proposed Jammu ring road is a Greenfield alignment with four lane configuration. The ring road will decongest the Jammu city and pave the way for the through traffic in NH-1A that is crossing Jammu to Kashmir from other parts of the country, especially from neighboring states like Punjab. The total length of the road is 58.25 km out of which 11.75 km are in Hilly terrain. The project includes 2 tunnels, 8 Flyovers, 16 underpasses, 4 viaducts, 31 minor bridges, 8 major bridges, 255 culverts, intersections, service roads and project facilities. The entire road is proposed to be constructed with rigid pavement except hilly terrain where it is flexible pavement.

]]>
Six Laning of Chilkaluripet Nellore Section of NH5 https://lntiel.com/index.php/six-laning-of-chilkaluripet-nellore-section-of-nh5/ https://lntiel.com/index.php/six-laning-of-chilkaluripet-nellore-section-of-nh5/#respond Mon, 09 Mar 2015 07:31:15 +0000 http://lntiel.com/?p=3614 Client: Client: SEL – (BSCPL & KMC JV)
Project Year: 2010

National Highway 5 (NH 5) is a major National Highway in India situated on India’s east coast starting from Chennai and ending at Jarpokharia passing through the states of Tamil Nadu, Andhra Pradesh and Orissa. The present Project road under scope of improvement starts at Martur town of Chilakaluripet at Ch.1182.802 via Ongole (Ch.1250) of Prakasam district, Kavali (Ch.1322) of Nellore district and ends at bypass of Nellore town of Ch. 1366.547.

]]>
https://lntiel.com/index.php/six-laning-of-chilkaluripet-nellore-section-of-nh5/feed/ 0
Detailed Project Report and Engineering Design for Kannur City Road Improvement Project https://lntiel.com/index.php/detailed-project-report-and-engineering-design-for-kannur-city-road-improvement-project/ https://lntiel.com/index.php/detailed-project-report-and-engineering-design-for-kannur-city-road-improvement-project/#respond Mon, 09 Mar 2015 07:28:27 +0000 http://lntiel.com/?p=3612 Client: Kerala Road Fund Board (KRFB), Government of Kerala
Project Year: 2012

Government of Kerala has L&T Infra Engineering for preparation of DPR for City Road Improvement Project in kannur Town of Kerala. Study area includes kannur municipality and surrounding panchayats with a population of around 2 lakhs.The main objective of current study is to prepare a Detailed Project Report for Kannur City Roads which includes identifying 12 priority roads covering 40 km.

]]>
https://lntiel.com/index.php/detailed-project-report-and-engineering-design-for-kannur-city-road-improvement-project/feed/ 0
Joda Mines Access Roads & Platforms Design https://lntiel.com/index.php/joda-mines-access-roads-platforms-design/ https://lntiel.com/index.php/joda-mines-access-roads-platforms-design/#respond Mon, 09 Mar 2015 07:25:51 +0000 http://lntiel.com/?p=3610 Client: L&T Limited, Engineering Construction and Contracts Division (ECC), Engineering Design and Research Centre (EDRC)
Project Year: 2009

The Highways Department of Government of Tamil Nadu, as part of State Road Sector Projects has intended to take up development 250 km state highways under Public Private Partnership (PPP).
The main objective of the study was to undertake Techno – Economic Feasibility Study for the selected 5 road stretches for a total length of 250 Km in the State of Tamilnadu and prepare Preliminary Project Report.
The Projects Roads were: Chennai Outer Ring Road Phase II, Mettur – Tiruppur Road (SH 37), Erode – Dharapuram Road (SH 83 A), Erode Outer Ring Road Phase II, Arcot Bypass

]]>
https://lntiel.com/index.php/joda-mines-access-roads-platforms-design/feed/ 0
Updating Feasibility Study Report for Phase II of KSTP (Kerala State Transport Project) https://lntiel.com/index.php/updating-feasibility-study-report-for-phase-ii-of-kstp-kerala-state-transport-project/ https://lntiel.com/index.php/updating-feasibility-study-report-for-phase-ii-of-kstp-kerala-state-transport-project/#respond Mon, 09 Mar 2015 07:22:52 +0000 http://lntiel.com/?p=3608 Client: Public Works Department, Government of Kerala
Project Year: 2009

The main objective of the study was to update the Techno-economic feasibility studies carried out in the year 2000, with focus on Phase II for a total stretch of 367.79 km in 8 road stretches. Since the feasibility report for Phase-II was prepared in the year 2000, it was needed to update the study to year 2009 scenario, to address changes in pavement condition, riding quality, land use pattern, and associated BOQ and unit rates for further submission to World Bank.

]]>
https://lntiel.com/index.php/updating-feasibility-study-report-for-phase-ii-of-kstp-kerala-state-transport-project/feed/ 0