Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Project Pre-bid Study for Ridership Estimation for Hyderabad Metro, India | Infrastructure

Portfolio

Project Pre-bid Study for Ridership Estimation for Hyderabad Metro, India

The main objective of the study is to estimate ridership on Hyderabad Metro by updating travel demand model using CUBE Software to arrive at realistic bid estimates.

The proposed Metro consists of three corridors (with total length of 71 km and 65 stations).

  1. Miyapur to L.B. Nagar
  2. Jubilee Bus Station (JBS) to Falaknuma

Nagole – Shilparamam

About Project

Reliance Energy ADA Group
19 February, 2015

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds