Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Detailed Design of Securing Dolphins at Kakinada Port | Infrastructure

Detailed Design of Securing Dolphins at Kakinada Port

9

Mar, 2015

Sembmarine Kakinada Limited (SKL) is developing a Dry Dock facility and proposed to construct dolphins and an approach platform to secure a steel floating dry dock.

It has two Dolphins of size 20.8X20.8m and an Approach platform of 37.6m Length and 12m width with Bored cast in-situ piles with Concrete Deck (+4.7m CD).

The Dolphin has to secure the floating dry dock on one side and allow berthing and mooring of vessels on the other side and an Approach Platform to provide access between NRW unit-1 and the nearest dolphin.

Back To

Leave a Reply

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds