Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Joda Mines Access Roads & Platforms Design | Infrastructure

Joda Mines Access Roads & Platforms Design

9

Mar, 2015

Client: L&T Limited, Engineering Construction and Contracts Division (ECC), Engineering Design and Research Centre (EDRC)
Project Year: 2009

The Highways Department of Government of Tamil Nadu, as part of State Road Sector Projects has intended to take up development 250 km state highways under Public Private Partnership (PPP).
The main objective of the study was to undertake Techno – Economic Feasibility Study for the selected 5 road stretches for a total length of 250 Km in the State of Tamilnadu and prepare Preliminary Project Report.
The Projects Roads were: Chennai Outer Ring Road Phase II, Mettur – Tiruppur Road (SH 37), Erode – Dharapuram Road (SH 83 A), Erode Outer Ring Road Phase II, Arcot Bypass

Back To

Leave a Reply

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds