Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Detailed Design of Bangalore International Airport, Bangalore | Infrastructure

Portfolio

Detailed Design of Bangalore International Airport, Bangalore

A JV Company, Bangalore International Airport Ltd., formed by Siemens Project Ventures, L&T, Unique Zurich Airport, KSIIDC and AAI was awarded a PPP project to develop a State-of-the Art Greenfield international airport at Devanahalli, Bangalore by the Government of Karnataka. The initial capacity of the airport is 11.5 million PAX and in the ultimate stage it should be capable of handling 50 million PAX.

The major civil engineering ‘design and build’ contract was awarded to L&T ECC who in turn engaged L&T Infra Engineering for the detailed design and production of construction drawings of all civil works except the terminal and other buildings. This airport successfully commenced commercial operations in May 2008.

About Project

L&T-ECCD, EDRC, Chennai
19 February, 2015

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds