Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
EIA Study For 3600 MW Thermal Power Plant, Captive Port and Desalination Plant at Cuddalore, Tamil Nadu | Infrastructure

Portfolio

EIA Study For 3600 MW Thermal Power Plant, Captive Port and Desalination Plant at Cuddalore, Tamil Nadu

Infrastructure Leasing and Financial Services Limited (IL&FS), one of the largest infrastructure financing and project development companies in India is planning to set up an imported coal based Thermal Power Plant of 3600 MW capacity with Super Critical Technology at Cuddalore, Cuddalore District, Tamil Nadu, captive port to handle the coal requirements for the proposed power plant, and also a captive desalination plant of 30 MLD capacity to meet the potable water requirements.

IL&FS has engaged L&T Infra Engineering to carry out Environmental Impact Assessment (EIA) study for the proposed project.

Project accorded Environmental/CRZ Clearances from MoEF

Consulting Services provided for the project include:

  • Primary Surveys of Terrestrial and Marine Environments
  • Establishing the Baseline Environmental Conditions
  • Identification and Prediction of impacts
  • Preparation of Environmental Management Plan
  • Preliminary Risk Analysis and Disaster Management Plan

About Project

Infrastructure Leasing and Financial Services Limited (IL&FS)
19 February, 2015

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds