Project Pre-bid Study for Ridership Estimation for Hyderabad Metro, India

The main objective of the study is to estimate ridership on Hyderabad Metro by updating travel demand model using CUBE Software to arrive at realistic bid estimates.

The proposed Metro consists of three corridors (with total length of 71 km and 65 stations).

  1. Miyapur to L.B. Nagar
  2. Jubilee Bus Station (JBS) to Falaknuma

Nagole – Shilparamam

About Project

Reliance Energy ADA Group
19 February, 2015