Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Study on Densification along Chennai Metro Rail Corridors | Infrastructure

Study on Densification along Chennai Metro Rail Corridors

9

Mar, 2015

Client: Chennai Metropolitan Development Authority (CMDA)
Project Year: 2012

Chennai Metro is a rapid transit system in two phases. Phase I of the project consists of 2 corridors covering a total length of 45.1 km with 32 stations (2 Interchange stations). About 55% of the corridor in Phase I is underground and the remaining is elevated. The elevated section of the project is scheduled to be operational by 2013 and the entire project is scheduled to be completed by 2015.

The objective of the study is to identify all the available options for enhancing the ridership of Metro including the spatial options of increased FSI along the Metro Corridors and Transit Oriented Development (TOD) at the transit stations and to recommend the implementations of these measures on priority commensurate with the quantum of enhanced ridership.

Back To

Leave a Reply

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds