Pre-bid Study for Ridership Estimation for Hyderabad Metro, India

9

Mar, 2015

Client: Reliance Energy ADA Group
Project Year: 2011

The main objective of the study is to estimate ridership on Hyderabad Metro by updating travel demand model using CUBE Software to arrive at realistic bid estimates.

The proposed Metro consists of three corridors (with total length of 71 km and 65 stations).

  1. Miyapur to L.B. Nagar
  2. Jubilee Bus Station (JBS) to Falaknuma

Nagole – Shilparamam