Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Model study for Tranquillity & Sedimentation at Kakinada Port | Infrastructure

Model study for Tranquillity & Sedimentation at Kakinada Port

19

May, 2015

Client: VGS Group Inc
Project Year: 2013

VGS Group INC, USA (VGS) is proposing to develop an offshore LNG import terminal at 20m water depth within the port limits of Kakinada Deep Water Port. The proposed development requires mathematical model study to estimate operational downtime for the terminal, extreme wave height at the terminal, storm surge due to past cyclones, advection-dispersion study for the return cold water from regasification of LNG, estimation of scour depth around the pile of LNG terminal and suspended sediment concentration during dredging for forming the pipe trench.
L&T – Ramboll Consulting Engineering Limited(LTR) has been appointed to carry out the required mathematical model study for the development of LNG Terminal.

Back To

Leave a Reply

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds