Warning: Missing argument 2 for wpdb::prepare(), called in /home/lntiel/public_html/wp-content/plugins/all-in-one-redirection/admin/class-all-in-one-redirection-admin.php on line 221 and defined in /home/lntiel/public_html/wp-includes/wp-db.php on line 1295
Monorail Substructure And Foundation, Mumbai | Infrastructure

Portfolio

Monorail Substructure And Foundation, Mumbai

The project involves the re-design of substructure and pile foundation for the Mumbai Monorail to accommodate utilities at site. The scope of the project is the detailed design and drawings for substructure and foundation wherever required. The total length of project stretch for which the re-design is carried out is approximately 11kms.

The project also includes the design of monorail frames including guide way beams, substructure and foundation for a total length of 1 km. The design of ancillary structures like TSS/ASS building, link way structures etc were also preformed.

Consulting Services provided for the project include:

  • Preparation of design basis report
  • Re-design and drawings for substructure and foundations and getting approval from IE
  • Detailed design and drawings for 9 monorail frames and getting approval from IE
  • Design and drawings for ancillary structures
  • Issue of Good for Construction drawings

About Project

L&T RLBU, Mumbai
19 February, 2015

Important


 

On January 3rd 2024, L&T IEL was acquired by Assystem Stup, the Indian subsidiary of the Assystem Group.

This is an exciting development for both companies. L&T IEL will continue to deliver the highest standards to its customers, operating under the Assystem brand name. 

To find out more about Assystem’s activities in India visit the Assystem website and keep up with news from our social feed here.

This will close in 0 seconds